RBA utilizes three simple performance measure questions:
The four quadrants are not equally important. The upper left quadrant (Fig. B) is the least important, and more time should be spent thinking and talking about measures in the right and bottom right quadrants.
As we go from least important measures to the most important measures, we go from having the most control to having the least control.
Nobody controls all the factors that effect program performance, but we are still accountable for our clients being better off.