All County Objectives

Amended
# 134

Soquel Congestion

Amended due to COVID-19 pandemic, work resuming.
By December 2024, Public Works will reduce congestion at key intersections on Soquel Drive from 41st Avenue to Main Street.

Key Steps

1 2 3 4
Determine existing Level of Service (LOS). Install signal at Soquel Drive and Robertson Street. Synchronize signals at 41st Avenue, Robertson Street, Porter Street and Main Street. Measure LOS after synchronization.
Plan Reference:
Target:
Baseline: Progress:
3.A.i 2 Level of Service 3 0% (3)

Level of Service (LOS) is a qualitative measure of traffic performance based on measures like vehicle speed, density, and congestion.
Existing LOS at the intersections addressed in this objective are:
Soquel Drive / 41st Avenue – C (am) / D (pm).  
Soquel Drive / Robertson St. – E (am) / F (pm).   
Soquel Drive / Daubenbiss Ave. – B (am) / A (pm).
Soquel Drive / Porter St. – E (am) / E (pm).

Future mitigations will result in a projected LOS of:
Soquel Drive / 41st Avenue – C (am) / C (pm).
Soquel Drive / Robertson St. – B (am) / D (pm).   
Soquel Drive / Daubenbiss Ave. – B (am) / A (pm).
Soquel Drive / Porter St. – C (am) / D (pm).

-->